/ News
Belt conveyor project concluded at Tukjang Youth Coal Mine
  A belt conveyor project was successfully concluded at the Tukjang Youth Coal Mine under the Tukjang Area Coal-Mining Complex.
  The establishment of the new belt conveyor system made it possible to accelerate the conveying speed and greatly increase the production of coal for thermal power stations while saving a lot of manpower, electricity, equipment and materials as against before.
  The inaugural ceremony of the belt conveyor system was held on the spot. Kim Jong Hak, Manager of the Tukjang Area Coal-Mining Complex, made an inaugural address, which was followed by speeches.
  After the ceremony, the participants looked round the belt conveyor system.