Measures taken to supply irrigation water
Ryongchon County of North Phyongan Province promotes the first-stage Songjong waterway bank perpetuation project. It took measures to provide manpower, equipment and materials and on this basis, organizes construction work and gives flexible command on the spot to ensure both the quality and speed of the project.
Anbyon County of Kangwon Province is concentrating efforts on securing water.
The county has planned to make dammed pools in a number of regions affected by drought and raise the water-pumping capacity and is giving precedence to their designs with the help of scientists and technicians of the sectors concerned.
Kowon County of South Hamgyong Province is taking technical measures to increase the water-conducting capacity on the basis of having learned about the actual conditions of the small reservoirs at farms.
The Unpha County Irrigation Management Station in North Hwanghae Province is solving the knotty problems in repairing pumping machine power equipment by tapping the reserves, possibilities and potentialities.
The Phyongsong Irrigation Machine Factory is putting spurs to the production of water pumps.